« | »

2010 Duck Boat Upgrades

With Duck season reopening on Dec 7th we have been putting some finishing touches on the boat. It was always in great shape but this off-season we went all out. We fixed some of the fibreglass dings, installed a rubber rail around the entire boat to protect it, replaced the rails that hold the grass on for concealment, purchased all new rubber mats for the floors to protect and to keep the noise down. We also replaced all the cleats, got new dock lines, running lights and gave it a new paint job (dark green). Now the last part is to paint the stalks of grass on the side with a lighter color for contrast. It will be completely finished and in the water this weekend. We overhauled the trailer as well, with a new winch strap and new lights. The entire setup looks like a million bucks. I will be sure to post pictures as soon as it’s complete. I still have plenty of deer hunting left in me, but bring on the duck season, maybe then I can finally shoot something, actually many things.

This entry was posted on Tuesday, November 30th, 2010 at 6:28 pm by Mike and is filed under Rubino Films Blog. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

One Response to “2010 Duck Boat Upgrades”

|
  1. […] Mike Rubino's Blog » Blog Archive » 2010 Duck Boat Upgrades […]

|

Leave a Reply